342 Maplehurst Ave, Toronto: 3-Storey Accessory Dwelling Unit
Follow this project · we email you when its status or build stage changes

3-Storey Accessory Dwelling Unit at 342 Maplehurst Ave, Toronto was permitted on July 16, 2026 with a stated construction value of $1M to $5M. New accessory dwelling unit, 3 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 342 Maplehurst Ave, Toronto |
| Project | 3-Storey Accessory Dwelling Unit |
| Building type | Residential |
| Work | New building |
| Storeys | 3 |
| Permit issued | July 16, 2026 |
| Housing units | 4 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since September 202418 other permits at this address
- September 24, 2024New building · under $1M
- September 26, 2024Demolition
- July 16, 2026New construction: 3-Storey Accessory Dwelling Unit · $1M to $5M (this page)
- August 25, 2026Small Residential Projects: demolition
- August 25, 2026Mechanical: demolition
- August 25, 2026Drains and site services: demolition
- August 2026Estimated construction start (estimate)
- August 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 2901 Bayview AveNew building · $50M to $100M · July 2026
- 2810 Bayview AveMechanical · $1M to $5M · March 2026
- 23 Carluke CresNew construction: demolition · $1M to $5M · August 2026
- 338 Willowdale AveNew building · $1M to $5M · May 2026
- 135 Glendora AveNew construction: demolition · $1M to $5M · January 2026
6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Aug 2027 | Estimate |
| Construction Site Security | Jul 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Jul 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Oct 2026 | Approach now |
| Elevators | Aug 2026 – Oct 2026 | Approach now |
| Framing | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Dec 2026 | Approach now |
| Masonry | Aug 2026 – Oct 2026 | Approach now |
| Waterproofing | Aug 2026 – Oct 2026 | Approach now |
| Roofing | Sep 2026 – Dec 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (August 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: Construction Site Security leads in Toronto · Structural Steel leads in Toronto · Elevators leads in Toronto · Framing leads in Toronto · every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1001 Queen St W: Healthcare Building Renovation
- 102 Guestville Ave: 3-Storey Retail Building Renovation
- 105 Scollard St: Office and Tenant Fit-Out
- 1076 Pape Ave: Affordable Housing Renovation
- 1117 Danforth Ave: 14-Storey Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 342 Maplehurst Ave?
3-Storey Accessory Dwelling Unit. New accessory dwelling unit, 3 storeys.
When was the permit issued for 342 Maplehurst Ave?
July 16, 2026, by the City of Toronto.
Who is building 342 Maplehurst Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 342 Maplehurst Ave need now?
Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.