Apartment Building at 3422 S Morgan St, Chicago was permitted on July 29, 2025 with a stated construction value of $1M to $5M. Spr 2019 cbc: new construction of four story mix-use building with office on ground floor, two dwelling units on 2nd-4th floor, two parking spaces in an accessory garage, and associated architectural, masonry construction, mechanical, electrical, and plumbing… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3422 S Morgan St, Chicago |
| Project | Apartment Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | July 29, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Spr 2019 cbc: new construction of four story mix-use building with office on ground floor, two dwelling units on 2nd-4th floor, two parking spaces in an accessory garage, and associated architectural, masonry construction, mechanical, electrical, and plumbing…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1050 N State St: 3-Storey Condominium Renovation
- 112 E Oak St: 3-Storey Retail Building Renovation
- 114 E Oak St: Office and Tenant Fit-Out
- 1212 S Michigan Ave: Restaurant Renovation
- 1220 W Jackson Blvd: 10-Storey Apartment Building Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3422 S Morgan St?
Apartment Building. Spr 2019 cbc: new construction of four story mix-use building with office on ground floor, two dwelling units on 2nd-4th floor, two parking spaces in an accessory garage, and associated architectural, masonry construction, mechanical, electrical, and plumbing…
When was the permit issued for 3422 S Morgan St?
July 29, 2025, by the City of Chicago.
Who is building 3422 S Morgan St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3422 S Morgan St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.