3510 S Michigan Ave, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 3510 S Michigan Ave, Chicago was permitted on May 19, 2025 with a stated construction value of $1M to $5M. 2019 cbrc, pbc/2fm - #09105: alteration level 2 per section 603 of the chicago rehab code. work includes upgrades to existing office building pertaining mostly to access control, exterior lighting & the building automation system. limited paving repairs near… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3510 S Michigan Ave, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 19, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Public Building Commission Of Chicago (pbc) |
| Decision makers and contacts | In Builtie |
From the permit: “2019 cbrc, pbc/2fm - #09105: alteration level 2 per section 603 of the chicago rehab code. work includes upgrades to existing office building pertaining mostly to access control, exterior lighting & the building automation system. limited paving repairs near…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 10406 S Maryland Ave: Townhomes Renovation
- 116 S Michigan Ave: Office and Tenant Fit-Out
- 1235 N Ashland Ave: 5-Storey Apartment Building
- 2701 N Clark St: 5-Storey Mixed-Use Building Renovation
- 3151 W Harrison St: Transit Facility Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3510 S Michigan Ave?
Office and Tenant Fit-Out. 2019 cbrc, pbc/2fm - #09105: alteration level 2 per section 603 of the chicago rehab code. work includes upgrades to existing office building pertaining mostly to access control, exterior lighting & the building automation system. limited paving repairs near…
When was the permit issued for 3510 S Michigan Ave?
May 19, 2025, by the City of Chicago.
Who is building 3510 S Michigan Ave?
Public Building Commission Of Chicago (pbc) is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 3510 S Michigan Ave need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.