360 Montrose Ave, Toronto: Mixed-Use Building

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Mixed-Use Building at 360 Montrose Ave, Toronto was permitted on August 24, 2026 with a stated construction value of $1M to $5M. Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address360 Montrose Ave, Toronto
ProjectMixed-Use Building
Building typeCommercial
WorkNew building
Permit issuedAugust 24, 2026
Housing units3
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitPacer Property Maintenance & Contracting Inc.
Decision makers and contactsIn Builtie

From the permit: “Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 360 Montrose Ave?

Mixed-Use Building. Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building

When was the permit issued for 360 Montrose Ave?

August 24, 2026, by the City of Toronto.

Who is building 360 Montrose Ave?

Pacer Property Maintenance & Contracting Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 360 Montrose Ave need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.