360 Montrose Ave, Toronto: Mixed-Use Building

Mixed-Use Building at 360 Montrose Ave, Toronto was permitted on August 24, 2026 with a stated construction value of $1M to $5M. Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 360 Montrose Ave, Toronto |
| Project | Mixed-Use Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 24, 2026 |
| Housing units | 3 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Pacer Property Maintenance & Contracting Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1001 Queen St W: Healthcare Building Renovation
- 102 Guestville Ave: 3-Storey Retail Building Renovation
- 105 Scollard St: Office and Tenant Fit-Out
- 1076 Pape Ave: Affordable Housing Renovation
- 1117 Danforth Ave: 14-Storey Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 360 Montrose Ave?
Mixed-Use Building. Demolition of existing two storey mixed-use building. Construction of new three storey mixed-use building
When was the permit issued for 360 Montrose Ave?
August 24, 2026, by the City of Toronto.
Who is building 360 Montrose Ave?
Pacer Property Maintenance & Contracting Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 360 Montrose Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
