386-394 Symington Ave, Toronto: Retail Building

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Retail Building at 386-394 Symington Ave, Toronto was permitted on August 28, 2026 with a stated construction value of under $1M. Proposal to construct a one-storey commercial building with a basement to accommodate a cafe with an outdoor patio. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address386-394 Symington Ave, Toronto
ProjectRetail Building
Building typeCommercial
WorkNew building
Permit issuedAugust 28, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to construct a one-storey commercial building with a basement to accommodate a cafe with an outdoor patio”

Where this project is

  1. Since May 20252 other permits at this address
  2. May 1, 2025Drains and site services · under $1M
  3. May 8, 2025New building
  4. May 27, 2025Drains and site services
  5. August 7, 2025Plumbing
  6. August 8, 2025Mechanical
  7. August 28, 2026New construction: Retail Building · under $1M (this page)
  8. September 2026Estimated construction start (estimate)
  9. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more new buildings within 1 km

  • 1245 Dupont StNew building · $100M to $250M · December 2025
  • 640 Lansdowne AveNew construction · $100M to $250M · March 2026
  • 980 Lansdowne AveNew construction · $25M to $50M · December 2025
  • 1884 Davenport RdAddition or alteration: roofing · $1M to $5M · May 2026
  • 19 Wiltshire AveFire and life safety: fire protection · $1M to $5M · February 2026

13 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 10 to approach now.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Construction Site SecuritySep 2026 – Oct 2026Approach now
Concrete and FoundationSep 2026 – Oct 2026Approach now
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Nov 2026Approach now
FramingSep 2026 – Nov 2026Approach now
PaintingOct 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now
RoofingOct 2026 – Nov 2026Approach now
Windows, Doors and GlazingOct 2026 – Nov 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 386-394 Symington Ave?

Retail Building. Proposal to construct a one-storey commercial building with a basement to accommodate a cafe with an outdoor patio

When was the permit issued for 386-394 Symington Ave?

August 28, 2026, by the City of Toronto.

Who is building 386-394 Symington Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 386-394 Symington Ave need now?

Estimated as of October 2026, the trades to approach now are site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.