3900 Yonge St, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Apartment Building Renovation at 3900 Yonge St, Toronto was permitted on September 18, 2025 with a stated construction value of under $1M. Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address3900 Yonge St, Toronto
NeighbourhoodBedford Park-Nortown
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedSeptember 18, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitXcel
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers”

Where this project is

  1. Since September 20177 other permits at this address
  2. September 8, 2017Addition or alteration · under $1M
  3. June 18, 2019Addition or alteration: plumbing · under $1M
  4. July 20, 2021Addition or alteration · under $1M
  5. October 27, 2021Plumbing · under $1M
  6. September 18, 2025Fire and life safety: Apartment Building Renovation · under $1M (this page)
  7. August 25, 2026Addition or alteration: interior alteration · under $1M
  8. October 2025Estimated construction start (estimate)
  9. April 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–2, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Xcel has 3 other projects in Builtie

  • Toronto · Addition or alteration: interior alteration · $1M to $5M · 2026
  • Toronto · New building · 2002
  • Toronto · Addition or alteration · 2003

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2025 – Apr 2026Estimate
Fire ProtectionNov 2025 – Dec 2025Window passed (est.)
Signage and WayfindingDec 2025 – Feb 2026Window passed (est.)
InsulationNov 2025 – Dec 2025Window passed (est.)
DrywallDec 2025 – Jan 2026Window passed (est.)
Low Voltage and DataDec 2025 – Jan 2026Window passed (est.)
TileDec 2025 – Jan 2026Window passed (est.)
Cabinetry and MillworkDec 2025 – Jan 2026Window passed (est.)
FlooringDec 2025 – Jan 2026Window passed (est.)
CountertopsDec 2025 – Jan 2026Window passed (est.)
Finish CarpentryDec 2025 – Jan 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (April 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 3900 Yonge St?

Apartment Building Renovation. Proposal for material alteration/ replacement of existing fire alarm bells with new fire alarm speakers

When was the permit issued for 3900 Yonge St?

September 18, 2025, by the City of Toronto.

Who is building 3900 Yonge St?

Xcel is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 3900 Yonge St need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.