400 N Michigan Ave, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 400 N Michigan Ave, Chicago was permitted on October 5, 2026 with a stated construction value of $1M to $5M. Self-cert 2019 cbrc - tenant buildout of 17,810 sqft for business office on the 8th floor, including alterations to electrical circuits, mechanical and plumbing. no change in use or occcupancy. (occupancy group b; type ia construction). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 400 N Michigan Ave, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 5, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Self-cert 2019 cbrc - tenant buildout of 17,810 sqft for business office on the 8th floor, including alterations to electrical circuits, mechanical and plumbing. no change in use or occcupancy. (occupancy group b; type ia construction)”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1537 N Orleans St: 4-Storey Apartment Building Renovation
- 2824 N Elston Ave: 3-Storey Institutional Project
- 4943 N Damen Ave: 5-Storey Mixed-Use Building
- 950 E 59th St: 7-Storey School Renovation
- 111 S Michigan Ave: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 400 N Michigan Ave?
Office and Tenant Fit-Out. Self-cert 2019 cbrc - tenant buildout of 17,810 sqft for business office on the 8th floor, including alterations to electrical circuits, mechanical and plumbing. no change in use or occcupancy. (occupancy group b; type ia construction)
When was the permit issued for 400 N Michigan Ave?
October 5, 2026, by the City of Chicago.
Who is building 400 N Michigan Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 400 N Michigan Ave need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
