41 Grenadier Rd, Toronto: Single-Family House Renovation
Follow this project · we email you when its status or build stage changes

Single-Family House Renovation at 41 Grenadier Rd, Toronto was permitted on May 27, 2025 with a stated construction value of $1M to $5M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 41 Grenadier Rd, Toronto |
| Neighbourhood | Roncesvalles |
| Project | Single-Family House Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | May 27, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 2, 2017Small Residential Projects: interior alteration
- August 2, 2017Plumbing
- September 26, 2017Small Residential Projects: interior alteration
- May 27, 2025Small Residential Projects: Single-Family House Renovation · $1M to $5M (this page)
- June 2025Estimated construction start (estimate)
- June 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 17 Dora AveNew construction · $10M to $25M · May 2026
- 2340 Dundas St WAddition or alteration: demolition · $1M to $5M · July 2026
- 72 Perth AveMechanical · $1M to $5M · January 2026
- 521 Lansdowne AveNew building · $1M to $5M · February 2026
- 2290 Dundas St WAddition or alteration: interior alteration · $1M to $5M · April 2026
9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2025 – Jun 2026 | Estimate |
| Fire Protection | Aug 2025 – Nov 2025 | Window passed (est.) |
| Signage and Wayfinding | Nov 2025 – Feb 2026 | Window passed (est.) |
| Insulation | Sep 2025 – Nov 2025 | Window passed (est.) |
| Drywall | Sep 2025 – Dec 2025 | Window passed (est.) |
| Low Voltage and Data | Sep 2025 – Dec 2025 | Window passed (est.) |
| Tile | Oct 2025 – Dec 2025 | Window passed (est.) |
| Cabinetry and Millwork | Sep 2025 – Dec 2025 | Window passed (est.) |
| Flooring | Oct 2025 – Dec 2025 | Window passed (est.) |
| Countertops | Oct 2025 – Dec 2025 | Window passed (est.) |
| Finish Carpentry | Oct 2025 – Dec 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1266 Queen St W: Apartment Building Renovation
- 133 Roncesvalles Ave: Mixed-Use Building Renovation
- 18 O'hara Ave: Single-Family House Renovation
- 76 Grenadier Rd: Single-Family House Renovation
- 229 Sorauren Ave: House Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 41 Grenadier Rd?
Single-Family House Renovation. Renovation or addition to a single-family house.
When was the permit issued for 41 Grenadier Rd?
May 27, 2025, by the City of Toronto.
Who is building 41 Grenadier Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 41 Grenadier Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.