42 Kappele Ave, Toronto: 2-Storey Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Single-Family House at 42 Kappele Ave, Toronto was permitted on May 5, 2025 with a stated construction value of under $1M. New single-family house, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address42 Kappele Ave, Toronto
NeighbourhoodLawrence Park North
Project2-Storey Single-Family House
Building typeResidential
WorkNew building
Storeys2
Permit issuedMay 5, 2025
Housing units1
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permit2239579 Ontario Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. May 5, 2025New construction: 2-Storey Single-Family House · under $1M (this page)
  2. May 5, 2025Drains and site services: demolition
  3. September 8, 2025Plumbing: demolition
  4. September 19, 2025Mechanical: demolition
  5. June 2025Estimated construction start (estimate)
  6. December 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2025 – Dec 2025Estimate
Fire ProtectionJul 2025 – Aug 2025Window passed (est.)
Signage and WayfindingAug 2025 – Oct 2025Window passed (est.)
InsulationJul 2025 – Aug 2025Window passed (est.)
DrywallJul 2025 – Aug 2025Window passed (est.)
Low Voltage and DataJul 2025 – Aug 2025Window passed (est.)
TileJul 2025 – Sep 2025Window passed (est.)
Cabinetry and MillworkJul 2025 – Aug 2025Window passed (est.)
FlooringJul 2025 – Sep 2025Window passed (est.)
CountertopsJul 2025 – Sep 2025Window passed (est.)
Finish CarpentryJul 2025 – Sep 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 42 Kappele Ave?

2-Storey Single-Family House. New single-family house, 2 storeys.

When was the permit issued for 42 Kappele Ave?

May 5, 2025, by the City of Toronto.

Who is building 42 Kappele Ave?

2239579 Ontario Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 42 Kappele Ave need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.