444 N Wabash Ave, Chicago: 5-Storey Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 20, 2026 from Builtie's permit data.

5-Storey Apartment Building Renovation at 444 N Wabash Ave, Chicago was permitted on August 27, 2026 with a stated construction value of $1M to $5M. Spr 2019 cbrc: revision to permit: #101062371 to replace existing elevator and adding two (2) new dwelling units (36 total dwelling units) in 5-story brick building w/ basement, sprinkler system to be modified (occupancy group r2 & a, type iv construction)… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address444 N Wabash Ave, Chicago
Project5-Storey Apartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedAugust 27, 2026
Stated construction value$1M to $5M
Estimated stagePermit
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Spr 2019 cbrc: revision to permit: #101062371 to replace existing elevator and adding two (2) new dwelling units (36 total dwelling units) in 5-story brick building w/ basement, sprinkler system to be modified (occupancy group r2 & a, type iv construction)…”

Which trades are being bought now

The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Chicago

All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 444 N Wabash Ave?

5-Storey Apartment Building Renovation. Spr 2019 cbrc: revision to permit: #101062371 to replace existing elevator and adding two (2) new dwelling units (36 total dwelling units) in 5-story brick building w/ basement, sprinkler system to be modified (occupancy group r2 & a, type iv construction)…

When was the permit issued for 444 N Wabash Ave?

August 27, 2026, by the City of Chicago.

Who is building 444 N Wabash Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 444 N Wabash Ave need now?

At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.