45 Manitoba Dr, Toronto: Institutional Project Renovation

Institutional Project Renovation at 45 Manitoba Dr, Toronto was permitted on June 25, 2026 with a stated construction value of under $1M. Proposed lighting upgrade, revisions to existing arena bowl lighting and lighting controls (including fire alarm tie-in). No changes to other systems (partitions, ceilings, HVAC, etc.). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 45 Manitoba Dr, Toronto |
| Project | Institutional Project Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 25, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed lighting upgrade, revisions to existing arena bowl lighting and lighting controls (including fire alarm tie-in). No changes to other systems (partitions, ceilings, HVAC, etc.)”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 26, 2025Mechanical
- November 28, 2025Addition or alteration
- December 19, 2025Plumbing
- June 25, 2026Fire and life safety: Institutional Project Renovation · under $1M (this page)
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 10 R Ordnance StNew building · $10M to $25M · April 2026
- 2 Strachan AveAddition or alteration: fire protection · $1M to $5M · April 2026
- 890 King St WAddition or alteration: interior alteration · $1M to $5M · March 2026
- 209 Fort York BlvdAddition or alteration · $1M to $5M · February 2026
- 905 King St WAddition or alteration: demolition · $1M to $5M · August 2026
8 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Aug 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 130 Wolseley St: Apartment Building Renovation
- 604 Bay St: Transit Facility Renovation
- 18 Preston Rd: Residential Project Renovation
- 1880-1890 Eglinton Ave E: Office and Tenant Fit-Out
- 11 Rochdale Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 45 Manitoba Dr?
Institutional Project Renovation. Proposed lighting upgrade, revisions to existing arena bowl lighting and lighting controls (including fire alarm tie-in). No changes to other systems (partitions, ceilings, HVAC, etc.)
When was the permit issued for 45 Manitoba Dr?
June 25, 2026, by the City of Toronto.
Who is building 45 Manitoba Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 45 Manitoba Dr need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.