50 Norway Ave, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Apartment Building Renovation at 50 Norway Ave, Toronto was permitted on May 19, 2026 with a stated construction value of under $1M. Proposal for window replacement and changes to window sill. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address50 Norway Ave, Toronto
NeighbourhoodThe Beaches
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedMay 19, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitToronto Seniors Housing Corporation
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for window replacement and changes to window sill”

Where this project is

  1. November 10, 2014Plumbing
  2. May 19, 2026Addition or alteration: Apartment Building Renovation · under $1M (this page)
  3. June 2026Estimated construction start (estimate)
  4. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

Toronto Seniors Housing Corporation has 12 other projects in Builtie

  • Toronto · Addition or alteration: facade work · $1M to $5M · 2025
  • Toronto · Mechanical · under $1M · 2025
  • Toronto · Mechanical: addition · under $1M · 2025

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Dec 2026Estimate
Construction Site SecurityMay 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJun 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Jul 2026Window passed (est.)
ElectricalJul 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJul 2026 – Aug 2026Window passed (est.)
PlumbingJun 2026 – Aug 2026Window passed (est.)
Fire ProtectionJul 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 50 Norway Ave?

Apartment Building Renovation. Proposal for window replacement and changes to window sill

When was the permit issued for 50 Norway Ave?

May 19, 2026, by the City of Toronto.

Who is building 50 Norway Ave?

Toronto Seniors Housing Corporation is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 50 Norway Ave need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.