500 Avenue Rd, Toronto: Apartment Building Renovation

Apartment Building Renovation at 500 Avenue Rd, Toronto was permitted on July 10, 2026 with a stated construction value of under $1M. Proposal for garage roof slab strengthening and waterproofing replacement along top surface of parking garage. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 500 Avenue Rd, Toronto |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | July 10, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for garage roof slab strengthening and waterproofing replacement along top surface of parking garage”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 4, 2022Addition or alteration: foundation
- February 21, 2024Addition or alteration · under $1M
- November 12, 2024Fire and life safety: fire protection
- July 10, 2026Addition or alteration: Apartment Building Renovation · under $1M (this page)
- August 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 155 Balmoral AveNew building · $50M to $100M · June 2026
- 29 Pleasant BlvdAddition or alteration: excavation and shoring · $10M to $25M · September 2026
- 324 R Spadina RdAddition or alteration · $5M to $10M · May 2026
- 1262 Yonge StAddition or alteration · $1M to $5M · May 2026
- 44 Jackes AveAddition or alteration · $1M to $5M · May 2026
15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 8 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Feb 2027 | Estimate |
| Construction Site Security | Jul 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Sep 2026 | Window passed (est.) |
| Framing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Oct 2026 | Approach now |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 55 University Ave: Utility Facility Renovation
- 2580 Kipling Ave: School Renovation
- 165 The Queensway: Parking Structure Renovation
- 3571 Sheppard Ave E: Office and Tenant Fit-Out
- 171 East Liberty St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 500 Avenue Rd?
Apartment Building Renovation. Proposal for garage roof slab strengthening and waterproofing replacement along top surface of parking garage
When was the permit issued for 500 Avenue Rd?
July 10, 2026, by the City of Toronto.
Who is building 500 Avenue Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 500 Avenue Rd need now?
Estimated as of October 2026, the trades to approach now are painting and roofing. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; window, door and glazing.