55 Malvern Ave, Toronto: School Renovation

School Renovation at 55 Malvern Ave, Toronto was permitted on June 24, 2026 with a stated construction value of under $1M. Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 55 Malvern Ave, Toronto |
| Neighbourhood | East End-Danforth |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 24, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of…”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since August 20054 other permits at this address
- April 27, 2017Fire and life safety: fire protection · under $1M
- December 19, 2017Designated Structures: roofing · under $1M
- January 24, 2019Addition or alteration: plumbing · under $1M
- August 14, 2019Plumbing
- August 14, 2019Mechanical: plumbing
- June 24, 2026Addition or alteration: School Renovation · under $1M (this page)
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 411 Victoria Park AveNew construction · $10M to $25M · March 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Aug 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 12 Malvern Ave: School Renovation
- 828 Kingston Rd: Apartment Building Renovation
- 2901 Danforth Ave: Office and Tenant Fit-Out
- 2500 Danforth Ave: Office and Tenant Fit-Out
- 2455 Danforth Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 55 Malvern Ave?
School Renovation. Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of…
When was the permit issued for 55 Malvern Ave?
June 24, 2026, by the City of Toronto.
Who is building 55 Malvern Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 55 Malvern Ave need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.