55 Malvern Ave, Toronto: School Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

School Renovation at 55 Malvern Ave, Toronto was permitted on June 24, 2026 with a stated construction value of under $1M. Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address55 Malvern Ave, Toronto
NeighbourhoodEast End-Danforth
ProjectSchool Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJune 24, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of…”

Where this project is

  1. Since August 20054 other permits at this address
  2. April 27, 2017Fire and life safety: fire protection · under $1M
  3. December 19, 2017Designated Structures: roofing · under $1M
  4. January 24, 2019Addition or alteration: plumbing · under $1M
  5. August 14, 2019Plumbing
  6. August 14, 2019Mechanical: plumbing
  7. June 24, 2026Addition or alteration: School Renovation · under $1M (this page)
  8. July 2026Estimated construction start (estimate)
  9. January 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jul 2026 – Jan 2027Estimate
Construction Site SecurityJul 2026 – Aug 2026Window passed (est.)
Concrete and FoundationJul 2026 – Aug 2026Window passed (est.)
Structural SteelJul 2026 – Aug 2026Window passed (est.)
ElevatorsJul 2026 – Aug 2026Window passed (est.)
FramingJul 2026 – Aug 2026Window passed (est.)
PaintingAug 2026 – Sep 2026Window passed (est.)
MasonryJul 2026 – Aug 2026Window passed (est.)
WaterproofingJul 2026 – Aug 2026Window passed (est.)
RoofingAug 2026 – Sep 2026Window passed (est.)
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 55 Malvern Ave?

School Renovation. Proposed alterations to existing elementary school. Existing school gymnasiums to receive new paints, doors, basketball hoops & backboards, ceilings, lights, bleachers, window protection screens, white boards, etc. as indicated on the proposed plans. Some of…

When was the permit issued for 55 Malvern Ave?

June 24, 2026, by the City of Toronto.

Who is building 55 Malvern Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 55 Malvern Ave need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.