560 Atlas Ave, Toronto: Retail Building Renovation

Retail Building Renovation at 560 Atlas Ave, Toronto was permitted on May 26, 2026 with a stated construction value of $1M to $5M. Demolition of existing house and construction of a new three storey sixplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 560 Atlas Ave, Toronto |
| Project | Retail Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | May 26, 2026 |
| Housing units | 6 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Demolition of existing house and construction of a new three storey sixplex”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 Civic Centre Crt: Office and Tenant Fit-Out
- 170 Campus Walk: Campus Building Renovation
- 174 Gamble Ave: 3-Storey Retail Building Renovation
- 227 Gamble Ave: Apartment Building Renovation
- 229 Gamble Ave: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 560 Atlas Ave?
Retail Building Renovation. Demolition of existing house and construction of a new three storey sixplex
When was the permit issued for 560 Atlas Ave?
May 26, 2026, by the City of Toronto.
Who is building 560 Atlas Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 560 Atlas Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
