5637 Finch Ave E, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 5637 Finch Ave E, Toronto was permitted on August 6, 2026 with a stated construction value of under $1M. Proposal for interior alterations for restaurant and party hall. Unit 8 & 9. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address5637 Finch Ave E, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 6, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitAlfa General Construction
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for interior alterations for restaurant and party hall. Unit 8 & 9”

Where this project is

  1. August 6, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  2. August 6, 2026Plumbing
  3. August 6, 2026Addition or alteration: interior alteration · under $1M
  4. August 13, 2026Plumbing
  5. September 4, 2026Mechanical
  6. August 2026Estimated construction start (estimate)
  7. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 2250 Markham RdNew building · $5M to $10M · May 2026
  • 2255 Markham RdAddition or alteration · $5M to $10M · July 2026
  • 31 Crittenden SqSmall Residential Projects: interior alteration · $1M to $5M · July 2026

3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–3, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Alfa General Construction has 5 other projects in Builtie

  • Toronto · Addition or alteration: interior alteration · under $1M · 2025
  • Toronto · Addition or alteration: demolition · under $1M · 2025
  • Toronto · Addition or alteration: interior alteration · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 7 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Mar 2027Estimate
Construction Site SecurityJul 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)
RoofingSep 2026 – Oct 2026Approach now
Windows, Doors and GlazingAug 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 5637 Finch Ave E?

Office and Tenant Fit-Out. Proposal for interior alterations for restaurant and party hall. Unit 8 & 9

When was the permit issued for 5637 Finch Ave E?

August 6, 2026, by the City of Toronto.

Who is building 5637 Finch Ave E?

Alfa General Construction is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 5637 Finch Ave E need now?

Estimated as of October 2026, the trades to approach now are painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, elevator, framing, masonry and waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.