61 Yorkville Ave, Toronto: Apartment Building Renovation

Apartment Building Renovation at 61 Yorkville Ave, Toronto was permitted on November 18, 2025 with a stated construction value of $5M to $10M. Proposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 61 Yorkville Ave, Toronto |
| Neighbourhood | Annex |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | November 18, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Sky Contracting Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 30 Hillsboro Ave: Apartment Building Renovation
- 4 Avenue Rd: Commercial Project Renovation
- 130 Bloor St W: Office and Tenant Fit-Out
- 252 Bloor St W: Campus Building Renovation
- 920 Yonge St: 19-Storey Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 61 Yorkville Ave?
Apartment Building Renovation. Proposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant
When was the permit issued for 61 Yorkville Ave?
November 18, 2025, by the City of Toronto.
Who is building 61 Yorkville Ave?
Sky Contracting Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 61 Yorkville Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.