62 Hocken Ave, Toronto: Single-Family House Renovation
Follow this project · we email you when its status or build stage changes

Single-Family House Renovation at 62 Hocken Ave, Toronto was permitted on June 30, 2026 with a stated construction value of under $1M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 62 Hocken Ave, Toronto |
| Project | Single-Family House Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | June 30, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 30, 2026Small Residential Projects: Single-Family House Renovation · under $1M (this page)
- June 30, 2026Plumbing: addition
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 324 R Spadina RdAddition or alteration · $5M to $10M · May 2026
- 24 Austin TerNew building · $1M to $5M · March 2026
- 791 St Clair Ave WAddition or alteration: interior alteration · $1M to $5M · January 2026
- 24 Ellsworth AveSmall Residential Projects: demolition · $1M to $5M · June 2026
- 50 Braemore GdnsSmall Residential Projects: excavation and shoring · $1M to $5M · March 2026
6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 9 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Sep 2026 | Window passed (est.) |
| Framing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: Painting leads in Toronto · every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 130 Wolseley St: Apartment Building Renovation
- 604 Bay St: Transit Facility Renovation
- 18 Preston Rd: Residential Project Renovation
- 1880-1890 Eglinton Ave E: Office and Tenant Fit-Out
- 11 Rochdale Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 62 Hocken Ave?
Single-Family House Renovation. Renovation or addition to a single-family house.
When was the permit issued for 62 Hocken Ave?
June 30, 2026, by the City of Toronto.
Who is building 62 Hocken Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 62 Hocken Ave need now?
Estimated as of October 2026, the trades to approach now are painting. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; roofing; window, door and glazing.