624 Mcroberts Ave, Toronto: 3-Storey Retail Building

3-Storey Retail Building at 624 Mcroberts Ave, Toronto was permitted on May 12, 2026 with a stated construction value of under $1M. Project proposal for a new 3 storey sixplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 624 Mcroberts Ave, Toronto |
| Project | 3-Storey Retail Building |
| Building type | Residential |
| Work | New building |
| Permit issued | May 12, 2026 |
| Housing units | 6 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Project proposal for a new 3 storey sixplex”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 20262 other permits at this address
- May 12, 2026New construction: 3-Storey Retail Building · under $1M (this page)
- May 12, 2026Plumbing
- May 12, 2026Mechanical
- May 12, 2026Drains and site services
- July 28, 2026Drains and site services
- July 28, 2026Small Residential Projects · $1M to $5M
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 55 Lonborough AveNew construction: demolition · $1M to $5M · March 2026
- 173 Ennerdale RdNew construction · $1M to $5M · May 2026
- 546 Mcroberts AveNew construction · $1M to $5M · June 2026
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 72 Bexhill Ave: Residential Project
- 890 Dundas St W: Retail Building Renovation
- 2115 Finch Ave W: Office and Tenant Fit-Out
- 45 Industrial St: Apartment Building Renovation
- 151 Front St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 624 Mcroberts Ave?
3-Storey Retail Building. Project proposal for a new 3 storey sixplex
When was the permit issued for 624 Mcroberts Ave?
May 12, 2026, by the City of Toronto.
Who is building 624 Mcroberts Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 624 Mcroberts Ave need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.