6543 S Champlain Ave, Chicago: Parking Structure Renovation

Parking Structure Renovation at 6543 S Champlain Ave, Chicago was permitted on October 7, 2025 with a stated construction value of $1M to $5M. Spr 2019 cbrc: cps till-pavement, playground and parking lot replacement/relocation; new trash enclosure, turf field, and (2) basketball half-courts; relocated driveway, 5ft tall ornamental fence. exterior improvements only, no interior scope of work.… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 6543 S Champlain Ave, Chicago |
| Project | Parking Structure Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 7, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Spr 2019 cbrc: cps till-pavement, playground and parking lot replacement/relocation; new trash enclosure, turf field, and (2) basketball half-courts; relocated driveway, 5ft tall ornamental fence. exterior improvements only, no interior scope of work.…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 10000 W Ohare St: Mixed-Use Building Renovation
- 15 E Oak St: Office and Tenant Fit-Out
- 163 E Walton Pl: Hotel Renovation
- 203 N Maplewood Ave: Warehouse
- 235 N Maplewood Ave: Warehouse
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 6543 S Champlain Ave?
Parking Structure Renovation. Spr 2019 cbrc: cps till-pavement, playground and parking lot replacement/relocation; new trash enclosure, turf field, and (2) basketball half-courts; relocated driveway, 5ft tall ornamental fence. exterior improvements only, no interior scope of work.…
When was the permit issued for 6543 S Champlain Ave?
October 7, 2025, by the City of Chicago.
Who is building 6543 S Champlain Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 6543 S Champlain Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
