664 Broadview Ave, Toronto: School Renovation

School Renovation at 664 Broadview Ave, Toronto was permitted on November 18, 2025 with a stated construction value of under $1M. Proposal for Change of Use for existing building from residential & rehab offices to only School Use. New 1-storey accessory building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 664 Broadview Ave, Toronto |
| Neighbourhood | North Riverdale |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | November 18, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for Change of Use for existing building from residential & rehab offices to only School Use. New 1-storey accessory building”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- November 7, 2025Addition or alteration · under $1M
- November 7, 2025Mechanical
- November 7, 2025Plumbing
- November 18, 2025Drains and site services: School Renovation · under $1M (this page)
- November 18, 2025Drains and site services
- December 2025Estimated construction start (estimate)
- June 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 690 Carlaw AveAddition or alteration · $1M to $5M · July 2026
4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Dec 2025 – Jun 2026 | Estimate |
| Construction Site Security | Nov 2025 – Jan 2026 | Window passed (est.) |
| Painting | Dec 2025 – Feb 2026 | Window passed (est.) |
| Masonry | Dec 2025 – Jan 2026 | Window passed (est.) |
| Waterproofing | Dec 2025 – Jan 2026 | Window passed (est.) |
| Roofing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Dec 2025 – Feb 2026 | Window passed (est.) |
| Electrical | Jan 2026 – Feb 2026 | Window passed (est.) |
| HVAC and Mechanical | Jan 2026 – Feb 2026 | Window passed (est.) |
| Plumbing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Fire Protection | Jan 2026 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 Danforth Ave: School Renovation
- 1 Bridgepoint Dr: Healthcare Building Renovation
- 55 Danforth Ave: Office and Tenant Fit-Out
- 285-297 Danforth Ave: Place of Worship Renovation
- 6 Kings College Rd: Campus Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 664 Broadview Ave?
School Renovation. Proposal for Change of Use for existing building from residential & rehab offices to only School Use. New 1-storey accessory building
When was the permit issued for 664 Broadview Ave?
November 18, 2025, by the City of Toronto.
Who is building 664 Broadview Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 664 Broadview Ave need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.