67 Westmount Ave, Toronto: House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

House Renovation at 67 Westmount Ave, Toronto was permitted on February 18, 2025 with a stated construction value of under $1M. Renovation or addition to a house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address67 Westmount Ave, Toronto
NeighbourhoodCorso Italia-Davenport
ProjectHouse Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedFebruary 18, 2025
Housing units1
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitDomus Design Build See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. February 18, 2025Small Residential Projects: House Renovation · under $1M (this page)
  2. February 18, 2025Plumbing: excavation and shoring
  3. December 12, 2025Mechanical: excavation and shoring
  4. March 2025Estimated construction start (estimate)
  5. September 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Mar 2025 – Sep 2025Estimate
Construction Site SecurityMar 2025 – Apr 2025Window passed (est.)
PaintingMar 2025 – May 2025Window passed (est.)
ElectricalApr 2025 – May 2025Window passed (est.)
HVAC and MechanicalApr 2025 – May 2025Window passed (est.)
PlumbingApr 2025 – May 2025Window passed (est.)
Fire ProtectionApr 2025 – May 2025Window passed (est.)
Signage and WayfindingJun 2025 – Jul 2025Window passed (est.)
InsulationApr 2025 – Jun 2025Window passed (est.)
DrywallMay 2025 – Jun 2025Window passed (est.)
Low Voltage and DataMay 2025 – Jun 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 67 Westmount Ave?

House Renovation. Renovation or addition to a house.

When was the permit issued for 67 Westmount Ave?

February 18, 2025, by the City of Toronto.

Who is building 67 Westmount Ave?

Domus Design Build is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 67 Westmount Ave need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.