69 W Washington St, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 69 W Washington St, Chicago was permitted on October 3, 2025 with a stated construction value of $5M to $10M. Self-cert 2019 cbc: interior renovation (build-out) of the 30th floor for cook county office area (occupancy group b, construction type i-a). structural peer review for infill of existing slab. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 69 W Washington St, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 3, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Self-cert 2019 cbc: interior renovation (build-out) of the 30th floor for cook county office area (occupancy group b, construction type i-a). structural peer review for infill of existing slab”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 250 E Superior St: Restaurant Renovation
- 4917 S Drexel Blvd: 12-Storey Apartment Building Renovation
- 2240 N Clybourn Ave: 4-Storey Retail Building
- 314 E 43rd St: Transit Facility Renovation
- 1313 S Sacramento Dr: 3-Storey School Renovation
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 69 W Washington St?
Office and Tenant Fit-Out. Self-cert 2019 cbc: interior renovation (build-out) of the 30th floor for cook county office area (occupancy group b, construction type i-a). structural peer review for infill of existing slab
When was the permit issued for 69 W Washington St?
October 3, 2025, by the City of Chicago.
Who is building 69 W Washington St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 69 W Washington St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
