71 Rexdale Blvd, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 71 Rexdale Blvd, Toronto was permitted on February 11, 2026 with a stated construction value of $1M to $5M. Proposal to convert existing unfinished space to an occupied office space. Mezzanine swing space fit-up. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 71 Rexdale Blvd, Toronto |
| Neighbourhood | West Humber-Clairville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | February 11, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | P & C General Contracting Limited |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to convert existing unfinished space to an occupied office space. Mezzanine swing space fit-up”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 170 Brockport Dr: Warehouse Renovation
- 279 Humberline Dr: Industrial Building Renovation
- 6650 Finch Ave W: Industrial Building Renovation
- 2200 Islington Ave: Office and Tenant Fit-Out
- 263 Carrier Dr: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 71 Rexdale Blvd?
Office and Tenant Fit-Out. Proposal to convert existing unfinished space to an occupied office space. Mezzanine swing space fit-up
When was the permit issued for 71 Rexdale Blvd?
February 11, 2026, by the City of Toronto.
Who is building 71 Rexdale Blvd?
P & C General Contracting Limited is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 71 Rexdale Blvd need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.