715 Milner Ave, Toronto: Warehouse Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Warehouse Renovation at 715 Milner Ave, Toronto was permitted on April 2, 2025 with a stated construction value of under $1M. Proposal to convert existing parking spots into storage cages and demolish section of existing cages in the warehouse.- Ground Floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address715 Milner Ave, Toronto
NeighbourhoodMalvern East
ProjectWarehouse Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedApril 2, 2025
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to convert existing parking spots into storage cages and demolish section of existing cages in the warehouse.- Ground Floor”

Where this project is

  1. Since February 202515 other permits at this address
  2. February 26, 2025Addition or alteration · under $1M
  3. April 2, 2025Addition or alteration: Warehouse Renovation · under $1M (this page)
  4. July 16, 2025Addition · under $1M
  5. October 22, 2025Addition or alteration: fire protection · under $1M
  6. November 25, 2025Fire and life safety: fire protection · under $1M
  7. January 15, 2026Addition or alteration: interior alteration · under $1M
  8. May 2025Estimated construction start (estimate)
  9. November 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 685 Military TrlAddition or alteration: interior alteration · $1M to $5M · May 2026

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2025 – Nov 2025Estimate
Construction Site SecurityApr 2025 – May 2025Window passed (est.)
PaintingMay 2025 – Jul 2025Window passed (est.)
ElectricalMay 2025 – Jul 2025Window passed (est.)
HVAC and MechanicalMay 2025 – Jul 2025Window passed (est.)
PlumbingMay 2025 – Jul 2025Window passed (est.)
Fire ProtectionMay 2025 – Jul 2025Window passed (est.)
Signage and WayfindingJul 2025 – Aug 2025Window passed (est.)
InsulationJun 2025 – Jul 2025Window passed (est.)
DrywallJun 2025 – Jul 2025Window passed (est.)
Low Voltage and DataJun 2025 – Jul 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 715 Milner Ave?

Warehouse Renovation. Proposal to convert existing parking spots into storage cages and demolish section of existing cages in the warehouse.- Ground Floor

When was the permit issued for 715 Milner Ave?

April 2, 2025, by the City of Toronto.

Who is building 715 Milner Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 715 Milner Ave need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.