72 Winters Lane, Toronto: Campus Building Renovation

Campus Building Renovation at 72 Winters Lane, Toronto was permitted on April 17, 2026 with a stated construction value of under $1M. Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 72 Winters Lane, Toronto |
| Project | Campus Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 20, 2007Mechanical: addition
- July 24, 2007Plumbing: addition
- November 8, 2007Addition or alteration: interior alteration
- November 8, 2007Mechanical
- April 17, 2026Addition or alteration: Campus Building Renovation · under $1M (this page)
- April 20, 2026Plumbing
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 4700 Keele StAddition or alteration: interior alteration · $5M to $10M · April 2026
- 170 Campus WalkAddition or alteration: plumbing · $1M to $5M · April 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Fire Protection | May 2026 – Jul 2026 | Window passed (est.) |
| Signage and Wayfinding | Jul 2026 – Sep 2026 | Window passed (est.) |
| Insulation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Drywall | Jun 2026 – Jul 2026 | Window passed (est.) |
| Low Voltage and Data | Jun 2026 – Jul 2026 | Window passed (est.) |
| Tile | Jun 2026 – Aug 2026 | Window passed (est.) |
| Cabinetry and Millwork | Jun 2026 – Jul 2026 | Window passed (est.) |
| Flooring | Jun 2026 – Aug 2026 | Window passed (est.) |
| Countertops | Jun 2026 – Aug 2026 | Window passed (est.) |
| Finish Carpentry | Jun 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 4560 Kingston Rd: Healthcare Building Renovation
- 272 Winona Dr: Office and Tenant Fit-Out
- 1416 Gerrard St E: Apartment Building Renovation
- 11 Advance Rd: Office and Tenant Fit-Out
- 1780 Markham Rd: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 72 Winters Lane?
Campus Building Renovation. Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc
When was the permit issued for 72 Winters Lane?
April 17, 2026, by the City of Toronto.
Who is building 72 Winters Lane?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 72 Winters Lane need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.