7427 Charlotte Pike, Nashville: Industrial Building Renovation

Industrial Building Renovation at 7427 Charlotte Pike, Nashville was permitted on June 26, 2025 with a stated construction value of $1M to $5M. To conduct renovations to existing building to convert a portion to cremation facilty. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. MIP bb poc andrew pierri. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 7427 Charlotte Pike, Nashville |
| Project | Industrial Building Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 26, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct renovations to existing building to convert a portion to cremation facilty. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. MIP bb poc andrew pierri”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 539 Opry Mills Dr: Office and Tenant Fit-Out
- 2088 Gallatin Pike N: Office and Tenant Fit-Out
- 20 Burton Hills Blvd: Office and Tenant Fit-Out
- 62 Parris Ave: Office and Tenant Fit-Out
- 1600 West End Ave: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 7427 Charlotte Pike?
Industrial Building Renovation. To conduct renovations to existing building to convert a portion to cremation facilty. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. MIP bb poc andrew pierri
When was the permit issued for 7427 Charlotte Pike?
June 26, 2025, by Metro Nashville and Davidson County.
Who is building 7427 Charlotte Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 7427 Charlotte Pike need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.