8 Hyde Park Crcl, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 8 Hyde Park Crcl, Toronto was permitted on October 15, 2026 with a stated construction value of $1M to $5M. Proposed sewer relocation at 2 Post Road. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address8 Hyde Park Crcl, Toronto
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedOctober 15, 2026
Stated construction value$1M to $5M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed sewer relocation at 2 Post Road”

Where this project is

  1. October 15, 2026Drains and site services: Apartment Building Renovation ยท $1M to $5M (this page)
  2. November 2026Estimated construction start (estimate)
  3. November 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 8 Hyde Park Crcl?

Apartment Building Renovation. Proposed sewer relocation at 2 Post Road

When was the permit issued for 8 Hyde Park Crcl?

October 15, 2026, by the City of Toronto.

Who is building 8 Hyde Park Crcl?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 8 Hyde Park Crcl need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.