800 Dickerson Pike, Nashville: Healthcare Building

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Healthcare Building at 800 Dickerson Pike, Nashville was permitted on September 3, 2025 with a stated construction value of $1M to $5M. To construct 11,264 sf non-residential building for; TRISTAR EAST NASHVILLE ER, a freestanding outpatient emergency room. TRISTAR SKYLINE MEDICAL CENTER. Located within SP, UDO MDHA. Poc: MIP 615-716-8111 info@permitxpd.com bb poc andrew pieri. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address800 Dickerson Pike, Nashville
ProjectHealthcare Building
Building typeInstitutional
WorkNew building
Permit issuedSeptember 3, 2025
Stated construction value$1M to $5M
Estimated stageSub-trades
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “To construct 11,264 sf non-residential building for; TRISTAR EAST NASHVILLE ER, a freestanding outpatient emergency room. TRISTAR SKYLINE MEDICAL CENTER. Located within SP, UDO MDHA. Poc: MIP 615-716-8111 info@permitxpd.com bb poc andrew pieri”

Which trades are being bought now

The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Fire Protection25% to 50%
Signage and Wayfinding25% to 70%
Insulation30% to 55%
Drywall35% to 60%
Low Voltage and Data35% to 60%
Tile45% to 65%
Cabinetry and Millwork50% to 70%
Flooring50% to 70%
Countertops55% to 75%
Finish Carpentry55% to 75%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Nashville

All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 800 Dickerson Pike?

Healthcare Building. To construct 11,264 sf non-residential building for; TRISTAR EAST NASHVILLE ER, a freestanding outpatient emergency room. TRISTAR SKYLINE MEDICAL CENTER. Located within SP, UDO MDHA. Poc: MIP 615-716-8111 info@permitxpd.com bb poc andrew pieri

When was the permit issued for 800 Dickerson Pike?

September 3, 2025, by Metro Nashville and Davidson County.

Who is building 800 Dickerson Pike?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 800 Dickerson Pike need now?

At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.