84 Merton St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 84 Merton St, Toronto was permitted on April 17, 2026 with a stated construction value of under $1M. Proposal for interior alteration for converting existing office to daycare including interior partition walls, plumbing and HVAC duct work. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 84 Merton St, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alteration for converting existing office to daycare including interior partition walls, plumbing and HVAC duct work”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 18, 2015Addition or alteration: facade work · under $1M
- October 6, 2015Mechanical: facade work
- October 6, 2015Plumbing: facade work
- April 17, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- April 17, 2026Plumbing
- April 17, 2026Mechanical: plumbing
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 4 more renovations within 1 km
- 2180 Yonge StAddition or alteration: elevator · $25M to $50M · March 2026
- 1951 Yonge StAddition or alteration: excavation and shoring · $1M to $5M · May 2026
- 111 Davisville AveAddition or alteration: mechanical · $1M to $5M · May 2026
- 2 St Clair Ave EAddition or alteration: interior alteration · $1M to $5M · May 2026
13 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Fire Protection | May 2026 – Jul 2026 | Window passed (est.) |
| Signage and Wayfinding | Jul 2026 – Sep 2026 | Window passed (est.) |
| Insulation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Drywall | Jun 2026 – Jul 2026 | Window passed (est.) |
| Low Voltage and Data | Jun 2026 – Jul 2026 | Window passed (est.) |
| Tile | Jun 2026 – Aug 2026 | Window passed (est.) |
| Cabinetry and Millwork | Jun 2026 – Jul 2026 | Window passed (est.) |
| Flooring | Jun 2026 – Aug 2026 | Window passed (est.) |
| Countertops | Jun 2026 – Aug 2026 | Window passed (est.) |
| Finish Carpentry | Jun 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 60 Carr St: Apartment Building Renovation
- 870 Jane St: Apartment Building Renovation
- 71 Charles St E: Apartment Building Renovation
- 55 York St: Office and Tenant Fit-Out
- 160 Dwight Ave: Warehouse Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 84 Merton St?
Office and Tenant Fit-Out. Proposal for interior alteration for converting existing office to daycare including interior partition walls, plumbing and HVAC duct work
When was the permit issued for 84 Merton St?
April 17, 2026, by the City of Toronto.
Who is building 84 Merton St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 84 Merton St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.