86 Bathurst St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 86 Bathurst St, Toronto was permitted on May 6, 2026 with a stated construction value of under $1M. Proposed interior alteration for proposed mercantile occupancy - retail furniture showroom. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 86 Bathurst St, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 6, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Bird Construction |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior alteration for proposed mercantile occupancy - retail furniture showroom”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since September 20202 other permits at this address
- September 11, 2020Demolition
- April 13, 2026Addition or alteration: interior alteration · under $1M
- April 14, 2026Mechanical
- April 15, 2026Plumbing
- April 23, 2026Designated Structures
- May 6, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 120 Peter StMechanical · $100M to $250M · March 2026
- 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
- 530 Front St WAddition or alteration: fire protection · $25M to $50M · July 2026
- 10 R Ordnance StNew building · $10M to $25M · April 2026
- 91 Augusta AveAddition or alteration · $5M to $10M · January 2026
16 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Bird Construction has 2 other projects in Builtie
- Toronto · Addition or alteration: fire protection · $5M to $10M · 2024
- Toronto · Addition or alteration: interior alteration · under $1M · 2024
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 – Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 130 Wolseley St: Apartment Building Renovation
- 604 Bay St: Transit Facility Renovation
- 18 Preston Rd: Residential Project Renovation
- 1880-1890 Eglinton Ave E: Office and Tenant Fit-Out
- 11 Rochdale Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 86 Bathurst St?
Office and Tenant Fit-Out. Proposed interior alteration for proposed mercantile occupancy - retail furniture showroom
When was the permit issued for 86 Bathurst St?
May 6, 2026, by the City of Toronto.
Who is building 86 Bathurst St?
Bird Construction is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 86 Bathurst St need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.