87 Front St E, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 87 Front St E, Toronto was permitted on February 7, 2025 with a stated construction value of under $1M. Proposal for interior renovation to the 2nd floor office suite. Renovation of the existing washrooms on 2nd and third floors. Enlarging office on 4th floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 87 Front St E, Toronto |
| Neighbourhood | St Lawrence-East Bayfront-The Islands |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | February 7, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Woodcliffe Properties |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior renovation to the 2nd floor office suite. Renovation of the existing washrooms on 2nd and third floors. Enlarging office on 4th floor”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- December 28, 2022Mechanical
- November 27, 2023Addition or alteration · under $1M
- February 7, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- March 2025Estimated construction start (estimate)
- September 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 285 Queen St EConditional Permit · $100M to $250M · May 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
- 81 Bay StAddition or alteration: interior alteration · $25M to $50M · December 2025
- 1 Adelaide St EAddition or alteration: demolition · $25M to $50M · June 2026
64 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2025 – Sep 2025 | Estimate |
| Construction Site Security | Feb 2025 – Apr 2025 | Window passed (est.) |
| Painting | Mar 2025 – May 2025 | Window passed (est.) |
| Electrical | Apr 2025 – May 2025 | Window passed (est.) |
| HVAC and Mechanical | Apr 2025 – May 2025 | Window passed (est.) |
| Plumbing | Mar 2025 – May 2025 | Window passed (est.) |
| Fire Protection | Apr 2025 – May 2025 | Window passed (est.) |
| Signage and Wayfinding | May 2025 – Jul 2025 | Window passed (est.) |
| Insulation | Apr 2025 – May 2025 | Window passed (est.) |
| Drywall | Apr 2025 – May 2025 | Window passed (est.) |
| Low Voltage and Data | Apr 2025 – May 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 121 Front St E: Office and Tenant Fit-Out
- 33 Harbour Sq: Office and Tenant Fit-Out
- 56 The Esplanade: Office and Tenant Fit-Out
- 1 York St: Office and Tenant Fit-Out
- 119 Front St E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 87 Front St E?
Office and Tenant Fit-Out. Proposal for interior renovation to the 2nd floor office suite. Renovation of the existing washrooms on 2nd and third floors. Enlarging office on 4th floor
When was the permit issued for 87 Front St E?
February 7, 2025, by the City of Toronto.
Who is building 87 Front St E?
Woodcliffe Properties is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 87 Front St E need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.