87 Hillhurst Blvd, Toronto: 2-Storey Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Single-Family House at 87 Hillhurst Blvd, Toronto was permitted on April 1, 2026 with a stated construction value of under $1M. New single-family house, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address87 Hillhurst Blvd, Toronto
Project2-Storey Single-Family House
Building typeResidential
WorkNew building
Storeys2
Permit issuedApril 1, 2026
Housing units1
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. Since November 20121 other permit at this address
  2. November 27, 2012Small Residential Projects: roofing
  3. November 27, 2012Plumbing: roofing
  4. April 1, 2026New construction: 2-Storey Single-Family House · under $1M (this page)
  5. April 1, 2026Plumbing
  6. April 1, 2026Drains and site services
  7. April 8, 2026Demolition
  8. May 2026Estimated construction start (estimate)
  9. November 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Nov 2026Estimate
Construction Site SecurityApr 2026 – May 2026Window passed (est.)
PaintingMay 2026 – Jul 2026Window passed (est.)
MasonryMay 2026Window passed (est.)
WaterproofingMay 2026Window passed (est.)
RoofingMay 2026 – Jun 2026Window passed (est.)
Windows, Doors and GlazingMay 2026 – Jun 2026Window passed (est.)
ElectricalMay 2026 – Jul 2026Window passed (est.)
HVAC and MechanicalMay 2026 – Jul 2026Window passed (est.)
PlumbingMay 2026 – Jul 2026Window passed (est.)
Fire ProtectionMay 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 87 Hillhurst Blvd?

2-Storey Single-Family House. New single-family house, 2 storeys.

When was the permit issued for 87 Hillhurst Blvd?

April 1, 2026, by the City of Toronto.

Who is building 87 Hillhurst Blvd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 87 Hillhurst Blvd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.