880 The Queensway, Toronto: 8-Storey Mixed-Use Building

8-Storey Mixed-Use Building at 880 The Queensway, Toronto was permitted on April 1, 2025 with a stated construction value of $25M to $50M. Proposal to construct a 8 storey mixed use building with 103 residential units, ground floor retail, and 2 levels of underground parking. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 880 The Queensway, Toronto |
| Project | 8-Storey Mixed-Use Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 1, 2025 |
| Housing units | 103 |
| Stated construction value | $25M to $50M |
| Estimated stage | Framing |
| Company named on the permit | Lormel Homes Ltd. |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to construct a 8 storey mixed use building with 103 residential units, ground floor retail, and 2 levels of underground parking”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 57 Wade Ave: 7-Storey Retail Building
- 530 Front St W: Office and Tenant Fit-Out
- 230 Front St W: Office and Tenant Fit-Out
- 185 Eileen Ave: 3-Storey Townhomes
- 40 Bay St: Institutional Project Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 880 The Queensway?
8-Storey Mixed-Use Building. Proposal to construct a 8 storey mixed use building with 103 residential units, ground floor retail, and 2 levels of underground parking
When was the permit issued for 880 The Queensway?
April 1, 2025, by the City of Toronto.
Who is building 880 The Queensway?
Lormel Homes Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 880 The Queensway need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
