89 E Randolph St, Chicago: Transit Facility Renovation

Transit Facility Renovation at 89 E Randolph St, Chicago was permitted on May 13, 2025 with a stated construction value of $50M to $100M. New metra rail transit platform to be built on reinforced concrete pilecaps with micropile foundations. new metra rail tranit platform extension built on reinsforced concrete pile aps with micorpile foundations connecting to existing platform. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 89 E Randolph St, Chicago |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 13, 2025 |
| Stated construction value | $50M to $100M |
| Estimated stage | Framing |
| Company named on the permit | Metra |
| Decision makers and contacts | In Builtie |
From the permit: “New metra rail transit platform to be built on reinforced concrete pilecaps with micropile foundations. new metra rail tranit platform extension built on reinsforced concrete pile aps with micorpile foundations connecting to existing platform”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 500 N Michigan Ave: 24-Storey Office-to-Residential Conversion
- 710 N Fairbanks Ct: Office and Tenant Fit-Out
- 171 N La Salle St: Office and Tenant Fit-Out
- 400 S Jefferson St: 4-Storey School Renovation
- 1650 E 95th St: Warehouse
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 89 E Randolph St?
Transit Facility Renovation. New metra rail transit platform to be built on reinforced concrete pilecaps with micropile foundations. new metra rail tranit platform extension built on reinsforced concrete pile aps with micorpile foundations connecting to existing platform
When was the permit issued for 89 E Randolph St?
May 13, 2025, by the City of Chicago.
Who is building 89 E Randolph St?
Metra is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 89 E Randolph St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.