90 Eglinton Ave E, Toronto: Office and Tenant Fit-Out

Street view near 90 Eglinton Ave E, Toronto
Street view near this address, photographed August 2025 before the permit. Photo: Dillan Payne, CC BY-SA 4.0, via Wikimedia Commons. Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 90 Eglinton Ave E, Toronto was permitted on September 22, 2025 with a stated construction value of under $1M. Proposed interior alterations for a medical office. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address90 Eglinton Ave E, Toronto
NeighbourhoodNorth Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 22, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitPowerOn
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alterations for a medical office”

Where this project is

  1. Since September 201116 other permits at this address
  2. September 7, 2011Addition or alteration: mechanical · under $1M
  3. November 1, 2012Addition or alteration · under $1M
  4. May 17, 2019Addition or alteration: plumbing · under $1M
  5. October 17, 2019Addition or alteration: interior alteration · under $1M
  6. June 30, 2022Addition or alteration · under $1M
  7. September 22, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  8. October 2025Estimated construction start (estimate)
  9. April 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 170 Roehampton AveNew building · over $250M · July 2026
  • 110 Broadway AveNew construction: excavation and shoring · $100M to $250M · February 2026
  • 100 Broadway AveNew construction: excavation and shoring · $50M to $100M · February 2026
  • 2200 Yonge StAddition or alteration: demolition · $50M to $100M · April 2026
  • 2180 Yonge StAddition or alteration: elevator · $25M to $50M · March 2026

15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 90 Eglinton Ave E?

Office and Tenant Fit-Out. Proposed interior alterations for a medical office

When was the permit issued for 90 Eglinton Ave E?

September 22, 2025, by the City of Toronto.

Who is building 90 Eglinton Ave E?

PowerOn is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 90 Eglinton Ave E need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.