931 Signal Xing, Nashville: Retail Building Renovation

Retail Building Renovation at 931 Signal Xing, Nashville was permitted on April 10, 2025 with a stated construction value of $1M to $5M. Interior renovation of existing 2,690 SF retail space to establish a take out restaurant use, Work to include demolition, carpentry, plumbing, mechanical and electrical. No change to building footprint. POC: Joshua Deragon. 615.415.6355. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 931 Signal Xing, Nashville |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 10, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Warwick Construction Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “Interior renovation of existing 2,690 SF retail space to establish a take out restaurant use, Work to include demolition, carpentry, plumbing, mechanical and electrical. No change to building footprint. POC: Joshua Deragon. 615.415.6355”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 120 10th Ave N: Office and Tenant Fit-Out
- 1030 16th Ave S: Office and Tenant Fit-Out
- 2315 Bowline Ave: Restaurant Renovation
- 320 Seven Springs Way: Office and Tenant Fit-Out
- 500 11th Ave N: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 931 Signal Xing?
Retail Building Renovation. Interior renovation of existing 2,690 SF retail space to establish a take out restaurant use, Work to include demolition, carpentry, plumbing, mechanical and electrical. No change to building footprint. POC: Joshua Deragon. 615.415.6355
When was the permit issued for 931 Signal Xing?
April 10, 2025, by Metro Nashville and Davidson County.
Who is building 931 Signal Xing?
Warwick Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 931 Signal Xing need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
