955 Church St, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 955 Church St, Nashville was permitted on June 30, 2025 with a stated construction value of $10M to $25M. To finish out 75,000SF 9th and 10th floor office space. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. bb MIP poc andrew pieri. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 955 Church St, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 30, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To finish out 75,000SF 9th and 10th floor office space. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. bb MIP poc andrew pieri”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 3200 Whites Creek Pike: Office and Tenant Fit-Out
- 3031 Century Farms Cir: 5-Storey Hotel
- 424 Chestnut St: Office and Tenant Fit-Out
- 1211 Medical Center Dr: Healthcare Building Renovation
- 2221 Murphy Ave: Healthcare Building Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 955 Church St?
Office and Tenant Fit-Out. To finish out 75,000SF 9th and 10th floor office space. no change to footprint. Third Party Review by Scott Berg SFMO #1281021737. bb MIP poc andrew pieri
When was the permit issued for 955 Church St?
June 30, 2025, by Metro Nashville and Davidson County.
Who is building 955 Church St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 955 Church St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
