977 College St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 977 College St, Toronto was permitted on March 3, 2026 with a stated construction value of under $1M. Interior alterations for proposed ground floor w/ ancillary basement Group E 'Cafe' (30 seats). No change to ex. second floor residential dwelling unit. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 977 College St, Toronto |
| Neighbourhood | Little Portugal |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | March 3, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior alterations for proposed ground floor w/ ancillary basement Group E 'Cafe' (30 seats). No change to ex. second floor residential dwelling unit”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 3, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- March 3, 2026Plumbing
- March 16, 2026Mechanical
- March 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 157 Delaware AveNew building · $5M to $10M · June 2026
- 980 Dufferin StAddition or alteration: interior alteration · $1M to $5M · August 2026
- 900 Dufferin StAddition or alteration: interior alteration · $1M to $5M · April 2026
- 999 Dufferin StNew construction · $1M to $5M · July 2026
- 163 St Clarens AveNew construction · $1M to $5M · February 2026
10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2026 – Oct 2026 | Estimate |
| Fire Protection | Apr 2026 – May 2026 | Window passed (est.) |
| Signage and Wayfinding | Jun 2026 – Jul 2026 | Window passed (est.) |
| Insulation | Apr 2026 – Jun 2026 | Window passed (est.) |
| Drywall | May 2026 – Jun 2026 | Window passed (est.) |
| Low Voltage and Data | May 2026 – Jun 2026 | Window passed (est.) |
| Tile | May 2026 – Jun 2026 | Window passed (est.) |
| Cabinetry and Millwork | May 2026 – Jun 2026 | Window passed (est.) |
| Flooring | May 2026 – Jun 2026 | Window passed (est.) |
| Countertops | May 2026 – Jun 2026 | Window passed (est.) |
| Finish Carpentry | May 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1138 Queen St W: Apartment Building Renovation
- 1481 Dundas St W: Retail Building Renovation
- 2306 St Clair Ave W: Office and Tenant Fit-Out
- 102 Tyndall Ave: Apartment Building Renovation
- 4530 Eglinton Ave W: Transit Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 977 College St?
Office and Tenant Fit-Out. Interior alterations for proposed ground floor w/ ancillary basement Group E 'Cafe' (30 seats). No change to ex. second floor residential dwelling unit
When was the permit issued for 977 College St?
March 3, 2026, by the City of Toronto.
Who is building 977 College St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 977 College St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.