1 Austin Ter, Toronto: Parking Structure Renovation

Parking Structure Renovation at 1 Austin Ter, Toronto was permitted on February 4, 2026 with a stated construction value of under $1M. Proposal for structural rehabilitation to the existing concrete and asphalt structures of the parking garage. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1 Austin Ter, Toronto |
| Neighbourhood | Casa Loma |
| Project | Parking Structure Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | February 4, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Liberty Entertainment Group |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for structural rehabilitation to the existing concrete and asphalt structures of the parking garage”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since April 20034 other permits at this address
- April 14, 2003Addition or alteration · under $1M
- April 19, 2012Addition or alteration · under $1M
- May 19, 2016Addition or alteration: mechanical · $1M to $5M
- December 15, 2017Designated Structures: structural work · $1M to $5M
- September 19, 2018Addition or alteration · under $1M
- February 4, 2026Addition or alteration: Parking Structure Renovation · under $1M (this page)
- March 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 155 Balmoral AveNew building · $50M to $100M · June 2026
- 324 R Spadina RdAddition or alteration · $5M to $10M · May 2026
- 263 Dupont StAddition or alteration · $5M to $10M · May 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2026 – Sep 2026 | Estimate |
| Construction Site Security | Feb 2026 – Apr 2026 | Window passed (est.) |
| Painting | Mar 2026 – May 2026 | Window passed (est.) |
| Masonry | Mar 2026 – Apr 2026 | Window passed (est.) |
| Waterproofing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Roofing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Electrical | Apr 2026 – May 2026 | Window passed (est.) |
| HVAC and Mechanical | Apr 2026 – May 2026 | Window passed (est.) |
| Plumbing | Mar 2026 – May 2026 | Window passed (est.) |
| Fire Protection | Apr 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 454 Avenue Rd: School Renovation
- 284 Avenue Rd: 3-Storey Mixed-Use Building Renovation
- 355 St Clair Ave W: Apartment Building Renovation
- 150 Heath St W: Apartment Building Renovation
- 574 Davenport Rd: 3-Storey Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1 Austin Ter?
Parking Structure Renovation. Proposal for structural rehabilitation to the existing concrete and asphalt structures of the parking garage
When was the permit issued for 1 Austin Ter?
February 4, 2026, by the City of Toronto.
Who is building 1 Austin Ter?
Liberty Entertainment Group is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1 Austin Ter need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
