100 W 49th Avenue, Vancouver: Campus Building Renovation

Campus Building Renovation at 100 W 49th Avenue, Vancouver was permitted on April 15, 2026 with a stated construction value of $1M to $5M. Field Review - Addition / Alteration - 100 W 49th Interior alterations to provide tenant improvements the existing continuing education office for Continuing Studies (CS) RMT Clinic on the ground floor of this existing community college (Langara College)… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 W 49th Avenue, Vancouver |
| Project | Campus Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 15, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Field Review - Addition / Alteration - 100 W 49th Interior alterations to provide tenant improvements the existing continuing education office for Continuing Studies (CS) RMT Clinic on the ground floor of this existing community college (Langara College)…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 1070 Le Roi Street: Apartment Building
- 1111 Haro Street: Apartment Building Renovation
- 1225 Robson Street: Hotel Renovation
- 1429 E 4th Avenue: 3-Storey Apartment Building Renovation
- 2 Beach Caretaker: Office and Tenant Fit-Out
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 W 49th Avenue?
Campus Building Renovation. Field Review - Addition / Alteration - 100 W 49th Interior alterations to provide tenant improvements the existing continuing education office for Continuing Studies (CS) RMT Clinic on the ground floor of this existing community college (Langara College)…
When was the permit issued for 100 W 49th Avenue?
April 15, 2026, by the City of Vancouver.
Who is building 100 W 49th Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100 W 49th Avenue need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
