101 Platform Way N, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 101 Platform Way N, Nashville was permitted on April 9, 2025 with a stated construction value of $1M to $5M. Renovation of 10th Floor Offices (CACT Permit #2020033980). Scope includes demolition and tenant interior buildout of existing space within Tower 1 of Nashville Yards Building on the 10th Floor. Demolition, Finishes, Mechanical, Plumbing, Electrical, and Low… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 101 Platform Way N, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 9, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Renovation of 10th Floor Offices (CACT Permit #2020033980). Scope includes demolition and tenant interior buildout of existing space within Tower 1 of Nashville Yards Building on the 10th Floor. Demolition, Finishes, Mechanical, Plumbing, Electrical, and Low…”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 644 Fogg St: Hotel
- 403 Ewing Dr: 3-Storey Apartment Building
- 26 Century Blvd: Office and Tenant Fit-Out
- 391 Wallace Rd: Institutional Project Renovation
- 642 Thompson Ln: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 101 Platform Way N?
Office and Tenant Fit-Out. Renovation of 10th Floor Offices (CACT Permit #2020033980). Scope includes demolition and tenant interior buildout of existing space within Tower 1 of Nashville Yards Building on the 10th Floor. Demolition, Finishes, Mechanical, Plumbing, Electrical, and Low…
When was the permit issued for 101 Platform Way N?
April 9, 2025, by Metro Nashville and Davidson County.
Who is building 101 Platform Way N?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 101 Platform Way N need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
