644 Fogg St, Nashville: Hotel

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Hotel at 644 Fogg St, Nashville was permitted on September 14, 2026 with a stated construction value of $1M to $5M. Per applicant, proposed use is HOTEL. Applicant to provide additional documentation in conformance with definition of hotel per 17.04.060. To construct new commercial building; 644 (hotel). To include 5 suites total, each having 3 bedrooms. Located within the… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address644 Fogg St, Nashville
ProjectHotel
Building typeCommercial
WorkNew building
Permit issuedSeptember 14, 2026
Stated construction value$1M to $5M
Estimated stagePermit
Company named on the permitCore Construction Group LLC
Decision makers and contactsIn Builtie

From the permit: “Per applicant, proposed use is HOTEL. Applicant to provide additional documentation in conformance with definition of hotel per 17.04.060. To construct new commercial building; 644 (hotel). To include 5 suites total, each having 3 bedrooms. Located within the…”

Which trades are being bought now

The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Nashville

All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 644 Fogg St?

Hotel. Per applicant, proposed use is HOTEL. Applicant to provide additional documentation in conformance with definition of hotel per 17.04.060. To construct new commercial building; 644 (hotel). To include 5 suites total, each having 3 bedrooms. Located within the…

When was the permit issued for 644 Fogg St?

September 14, 2026, by Metro Nashville and Davidson County.

Who is building 644 Fogg St?

Core Construction Group LLC is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 644 Fogg St need now?

At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.