1037 Bloor St W, Toronto: Place of Worship Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Place of Worship Renovation at 1037 Bloor St W, Toronto was permitted on June 11, 2025 with a stated construction value of under $1M. Proposal for multiple projects (addition and interior alterations). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1037 Bloor St W, Toronto
NeighbourhoodDufferin Grove
ProjectPlace of Worship Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJune 11, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for multiple projects (addition and interior alterations)”

Where this project is

  1. February 5, 1996Plumbing · under $1M
  2. May 23, 2013Addition or alteration: foundation · under $1M
  3. June 11, 2025Addition or alteration: Place of Worship Renovation · under $1M (this page)
  4. June 11, 2025Plumbing: addition
  5. June 11, 2025Mechanical: addition
  6. June 2025Estimated construction start (estimate)
  7. January 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 1141 Bloor St WNew building · $100M to $250M · August 2026
  • 157 Delaware AveNew building · $5M to $10M · June 2026
  • 980 Dufferin StAddition or alteration: interior alteration · $1M to $5M · August 2026
  • 900 Dufferin StAddition or alteration: interior alteration · $1M to $5M · April 2026
  • 999 Dufferin StNew construction · $1M to $5M · July 2026

15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1037 Bloor St W?

Place of Worship Renovation. Proposal for multiple projects (addition and interior alterations)

When was the permit issued for 1037 Bloor St W?

June 11, 2025, by the City of Toronto.

Who is building 1037 Bloor St W?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1037 Bloor St W need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.