105 Maitland St, Toronto: School Renovation

More photos of this address 2

Dillan PayneCC BY-SA 4.0 · Commons

Dillan PayneCC BY-SA 4.0 · Commons
School Renovation at 105 Maitland St, Toronto was permitted on February 21, 2025 with a stated construction value of under $1M. Proposal to repair and replace wood windows and storm doors for buildings C and D of "Canada's National Ballet School". Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 105 Maitland St, Toronto |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | February 21, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to repair and replace wood windows and storm doors for buildings C and D of "Canada's National Ballet School"”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- February 21, 2025Addition or alteration: School Renovation · under $1M (this page)
- March 2025Estimated construction start (estimate)
- September 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 717 Church StNew building · $100M to $250M · March 2026
- 227 Gerrard St ENew building · $25M to $50M · October 2025
- 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
- 112 College StAddition or alteration: interior alteration · $10M to $25M · June 2026
23 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2025 – Sep 2025 | Estimate |
| Construction Site Security | Mar 2025 – Apr 2025 | Window passed (est.) |
| Painting | Apr 2025 – May 2025 | Window passed (est.) |
| Electrical | Apr 2025 – May 2025 | Window passed (est.) |
| HVAC and Mechanical | Apr 2025 – May 2025 | Window passed (est.) |
| Plumbing | Apr 2025 – May 2025 | Window passed (est.) |
| Fire Protection | Apr 2025 – May 2025 | Window passed (est.) |
| Signage and Wayfinding | Jun 2025 – Jul 2025 | Window passed (est.) |
| Insulation | Apr 2025 – Jun 2025 | Window passed (est.) |
| Drywall | May 2025 – Jun 2025 | Window passed (est.) |
| Low Voltage and Data | May 2025 – Jun 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1738 Islington Ave: School Renovation
- 36 Lee Centre Dr: Apartment Building Renovation
- 42 Centre St: 3-Storey Retail Building
- 300 Humber College Blvd: Industrial Building Renovation
- 65 Navy Wharf Crt: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 105 Maitland St?
School Renovation. Proposal to repair and replace wood windows and storm doors for buildings C and D of "Canada's National Ballet School"
When was the permit issued for 105 Maitland St?
February 21, 2025, by the City of Toronto.
Who is building 105 Maitland St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 105 Maitland St need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.