109 East Ave, Thunder Bay: Retail Building

Retail Building at 109 East Ave, Thunder Bay was permitted on April 17, 2026 with a stated construction value of $1M to $5M. Assembly/Commercial - Construct a 1-storey Strip mall. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 109 East Ave, Thunder Bay |
| Project | Retail Building |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 17, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Assembly/Commercial - Construct a 1-storey Strip mall”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Thunder Bay
- 59 Carl Ave: 3-Storey Rental Building
- 750 Hammond Ave: Industrial Building Renovation
- 235 Simpson St: Retail Building Renovation
- 523 Algoma St N: Commercial Project Renovation
- 300 Legion Track Dr: Industrial Building Renovation
All of them: construction projects in Thunder Bay by address. The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 109 East Ave?
Retail Building. Assembly/Commercial - Construct a 1-storey Strip mall
When was the permit issued for 109 East Ave?
April 17, 2026, by the City of Thunder Bay.
Who is building 109 East Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 109 East Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
