1130 Polk Ave, Nashville: Warehouse Renovation

Warehouse Renovation at 1130 Polk Ave, Nashville was permitted on September 10, 2026 with a stated construction value of $1M to $5M. Rehab/ Renovation of an existing 1-story warehouse to accommodate and Electric Vehicle Charging Station, including electrical, mechanical and plumbing alterations, replacement of the roof w/out structural changes and minor pavement repair. Two new… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1130 Polk Ave, Nashville |
| Project | Warehouse Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 10, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Rehab/ Renovation of an existing 1-story warehouse to accommodate and Electric Vehicle Charging Station, including electrical, mechanical and plumbing alterations, replacement of the roof w/out structural changes and minor pavement repair. Two new…”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 155 1st Ave S: Hotel Renovation
- 401 Commerce St: Office and Tenant Fit-Out
- 507 Houston St: Office and Tenant Fit-Out
- 5 City Blvd: Office and Tenant Fit-Out
- 201 8th Ave S: Hotel Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1130 Polk Ave?
Warehouse Renovation. Rehab/ Renovation of an existing 1-story warehouse to accommodate and Electric Vehicle Charging Station, including electrical, mechanical and plumbing alterations, replacement of the roof w/out structural changes and minor pavement repair. Two new…
When was the permit issued for 1130 Polk Ave?
September 10, 2026, by Metro Nashville and Davidson County.
Who is building 1130 Polk Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1130 Polk Ave need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.