155 1st Ave S, Nashville: Hotel Renovation

Hotel Renovation at 155 1st Ave S, Nashville was permitted on September 5, 2025 with a stated construction value of $1M to $5M. To conduct interior renovations for new tenant, BACCO (restaurant, full service) within existing FOUR SEASONS HOTEL (hotel). Restaurant build-out to include 4,907 sf of existing interior space and 1,153 sf of existing covered exterior space. No change to… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 155 1st Ave S, Nashville |
| Project | Hotel Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 5, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Dowdle Construction Group LLC |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct interior renovations for new tenant, BACCO (restaurant, full service) within existing FOUR SEASONS HOTEL (hotel). Restaurant build-out to include 4,907 sf of existing interior space and 1,153 sf of existing covered exterior space. No change to…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1130 Polk Ave: Warehouse Renovation
- 401 Commerce St: Office and Tenant Fit-Out
- 507 Houston St: Office and Tenant Fit-Out
- 5 City Blvd: Office and Tenant Fit-Out
- 201 8th Ave S: Hotel Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 155 1st Ave S?
Hotel Renovation. To conduct interior renovations for new tenant, BACCO (restaurant, full service) within existing FOUR SEASONS HOTEL (hotel). Restaurant build-out to include 4,907 sf of existing interior space and 1,153 sf of existing covered exterior space. No change to…
When was the permit issued for 155 1st Ave S?
September 5, 2025, by Metro Nashville and Davidson County.
Who is building 155 1st Ave S?
Dowdle Construction Group LLC is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 155 1st Ave S need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
