115 S Catalina St, Los Angeles: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 115 S Catalina St, Los Angeles was permitted on September 18, 2025 with a stated construction value of under $1M. (eplan) TO REPAIR FIRE DAMAGED EXISING 4-UNITS TENEMENT HOUSE.<FULLY SPRINKLERED WITH NFPA-13R>. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 115 S Catalina St, Los Angeles |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | September 18, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Likely complete |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “(eplan) TO REPAIR FIRE DAMAGED EXISING 4-UNITS TENEMENT HOUSE.<FULLY SPRINKLERED WITH NFPA-13R>”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 18, 2025Alteration: Apartment Building Renovation · under $1M (this page)
- January 17, 2026Alteration: fire protection · under $1M
- October 2025Estimated construction start (estimate)
- April 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 100 S Normandie AveNew construction · $10M to $25M · December 2025
- 350 S Alexandria AveNew building · $10M to $25M · April 2026
- 425 S Shatto PlAlteration · $5M to $10M · February 2026
- 110 N Mariposa AveNew building · $1M to $5M · June 2026
- 316 S Catalina StNew building · $1M to $5M · October 2026
7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
Find work like this in Los Angeles
Leads for your trade: every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 670 S Western Ave: Apartment Building Renovation
- 14542 W Margate St: 2-Storey Accessory Dwelling Unit
- 10882 W Dora St: Accessory Dwelling Unit
- 2250 E 114th St: Institutional Project
- 1648 S Abbot Kinney Blvd: Retail Building
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 115 S Catalina St?
Apartment Building Renovation. (eplan) TO REPAIR FIRE DAMAGED EXISING 4-UNITS TENEMENT HOUSE.
When was the permit issued for 115 S Catalina St?
September 18, 2025, by the City of Los Angeles.
Who is building 115 S Catalina St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 115 S Catalina St need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
