12 Market St, Toronto: Restaurant Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Restaurant Renovation at 12 Market St, Toronto was permitted on January 9, 2026 with a stated construction value of under $1M. Proposal to relocate existing mechanical to accommodate food service equipment. The space was an existing cafe and just changing things around. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address12 Market St, Toronto
NeighbourhoodSt Lawrence-East Bayfront-The Islands
ProjectRestaurant Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedJanuary 9, 2026
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to relocate existing mechanical to accommodate food service equipment. The space was an existing cafe and just changing things around”

Where this project is

  1. July 27, 2011Mechanical
  2. July 30, 2013Mechanical
  3. March 17, 2014Mechanical
  4. January 9, 2026Mechanical: Restaurant Renovation · under $1M (this page)
  5. January 2026Estimated construction start (estimate)
  6. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 285 Queen St EConditional Permit · $100M to $250M · May 2026
  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
  • 81 Bay StAddition or alteration: interior alteration · $25M to $50M · December 2025
  • 1 Adelaide St EAddition or alteration: demolition · $25M to $50M · June 2026

62 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jan 2026 – Aug 2026Estimate
Signage and WayfindingApr 2026 – Jun 2026Window passed (est.)
CountertopsMar 2026 – May 2026Window passed (est.)
Finish CarpentryMar 2026 – May 2026Window passed (est.)
Appliances and EquipmentApr 2026 – May 2026Window passed (est.)
LandscapingApr 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (January 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 12 Market St?

Restaurant Renovation. Proposal to relocate existing mechanical to accommodate food service equipment. The space was an existing cafe and just changing things around

When was the permit issued for 12 Market St?

January 9, 2026, by the City of Toronto.

Who is building 12 Market St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 12 Market St need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.